Jujube/ambacht-production-notes: Difference between revisions

From XPUB & Lens-Based wiki
(Created page with "= pre-production = * Scouting 9/28 Talked to Lis. Continue 9/29 at Karel de Stouteplein (after 1pm). Some bands playing, bring AV for testing. * Procedural script: See note...")
 
No edit summary
 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
= pre-production =
= pre-production =


* Scouting 9/28
* Prep/Scouting
{|
| 9/28 || <s>Talk to Lies.</s> Continue 9/29 at Karel de Stouteplein after 1pm.
|-
| 9/29 || <s>Meet Lies (again) and Gilbert.</s> Agreed on shooting date: Sat, 10/6.
|-
| 9/30 || <s>Email Rob for best practices.</s>
|-
| 10/1 || <s>Meet with Rob.</s> Scheduled test shooting with Rob on Thursday 10/4 (pm, WdKA cafeteria).
|-
| 10/4 || <s>Meet with Rob take 2.</s>
|}


Talked to Lis. Continue 9/29 at Karel de Stouteplein (after 1pm). Some bands playing, bring AV for testing.
==  scenes ==


* Procedural script: See notes.
One run:
* sit-down interview with Gilbert
* across-the-bar interview with Lies
* Gilbert in front of the drum set (record playing in the background)


* Equipments (from rental)
On foot:
# For audio: <s>Røde NTG-2/Marantz PMC661/(maybe) Focusrite Scarlett 2i4</s> Zoom H6 with XY and MS mics/Senheisser ew 100 G3 Lavalier
* spontaneous conversations either in the kitchen
# For video: Tripod <s>Sachtler 0370 system FSB 4</s>Manfrotto 804RC2
* Lies prepping food
* band playing on the cafe stage
* customers


* Questions: contextual + direct
Objects and movements:
* record player with spinning vinyl
* sidewalk
* house plate (window sill)
* prepping a coffee, serving
* during performance: audience - coming in, reactions, beer glasses


# Testing out audio/video. Can you tell me about your day so far?
 
# When did you move here... from where? (& why?)
== equipments (from rental) ==
# How did you decide on the name of this place?
 
# When did you start hosting events?
* For audio: Zoom H6 with XY and MS mics/Senheisser ew 100 G3 Lavalier/Headset!
# Were they strictly music events?
* For video: Tripod Manfrotto 804RC2
# What are some of your favorite performances that you hosted?
 
# What's your relationship with jazz?
= production =
# If you can use one word to summarize what drives you, what would it be?
 
# Why is anger important?
== Sat 10/6 ==
# Do you think other people are angry?
 
Place: Koffie & Ambacht
 
Assistant: Mia Paller
 
Time:
 
{| class="wikitable"
|-
| 13:00 || meet Mia in West
|-
| 14:00 - 15:00 || arrive on site and set up
|-
| 15:00 || scenes: Lies and Gilbert
|-
| 18:30-20:00 || break
|-
| 20:00-21:30 || scenes: band (only Jue on set is okay)
|-
| 22:00 || end of day
|}
 
== Fri 10/12 ==
 
Due to miscommunication, no interviews were conducted on 10/6. Got some usable footage for concert prep and concert.
 
Rescheduled interview for 11am on Friday, 10/12. Mia will help again with sound.
 
 
=== Planning notes 10/12 ===
 
- Use Autofocus first
 
- Bring 50mm and 85mm lenses
 
- Redo scenes (see below)
 
- Look up Johnny Johnny Hello music
 
== Interview questions ==
 
=== Gilbert ===
 
Testing out audio/video
 
*Can you tell me about your day so far?
 
You:
 
* When did you move here... from where? Why?
* The first time I came here, you mentioned that you need anger to do this. Why is anger important?
* Do you think other people are angry?
 
=== Lies ===
 
* What is your ambacht? Why did you choose it?
* What is more important? Your workshop or your kitchen?
* How do you divide or unite the different spaces - cafe, workshop, family? What's the relationship between these spaces?
 
=== both ===
 
* When did you open this place?
* How did you decide on the name of this place?
* How did you envision this space? Have you realized your vision(s)?
* How do you sustain it?
* How has it changed?
* What are some of your favorite performances that you hosted
 
== Redo ==
 
10/12
 
tour of studio
 
wine rack
 
apple trees and Lies standing
 
pictures in the back
 
daughter
 
mirror frame of bar
 
== Recap 10/12 ==
 
{| class="wikitable"
|-
| 9:00 || pick up equipments at rental + test equipments + print out questions
|-
| 10:30 || meet Mia at Maastunnel
|-
| 10:50 || arrival
|-
| 11:00 || set up shoot
|-
| 11:20|| interview in cafe
|-
| 12:15 || interview in studio
|-
| 13:30 || lunch (spontaneous :)
|-
| 13:50 || more footage (action + outside)
|-
| 14:30 || end of shoot
|}
 
On site, I interviewed the two sitting side by side, rather than separately as was in the script. I also didn't ask the questions in order. A lot of it is about weighing the situations as they happen, which is a nice challenge. The canon 5D battery lasted for about 3 hours of shooting. We didn't use a clip-on mic and opted for the zoom XY. No extra batteries was used for the mic.
 
For a small scale project like this, ideally I would work with at least two other people: one for cinematography and one for audio.

Latest revision as of 21:27, 12 October 2018

pre-production

  • Prep/Scouting
9/28 Talk to Lies. Continue 9/29 at Karel de Stouteplein after 1pm.
9/29 Meet Lies (again) and Gilbert. Agreed on shooting date: Sat, 10/6.
9/30 Email Rob for best practices.
10/1 Meet with Rob. Scheduled test shooting with Rob on Thursday 10/4 (pm, WdKA cafeteria).
10/4 Meet with Rob take 2.

scenes

One run:

  • sit-down interview with Gilbert
  • across-the-bar interview with Lies
  • Gilbert in front of the drum set (record playing in the background)

On foot:

  • spontaneous conversations either in the kitchen
  • Lies prepping food
  • band playing on the cafe stage
  • customers

Objects and movements:

  • record player with spinning vinyl
  • sidewalk
  • house plate (window sill)
  • prepping a coffee, serving
  • during performance: audience - coming in, reactions, beer glasses


equipments (from rental)

  • For audio: Zoom H6 with XY and MS mics/Senheisser ew 100 G3 Lavalier/Headset!
  • For video: Tripod Manfrotto 804RC2

production

Sat 10/6

Place: Koffie & Ambacht

Assistant: Mia Paller

Time:

13:00 meet Mia in West
14:00 - 15:00 arrive on site and set up
15:00 scenes: Lies and Gilbert
18:30-20:00 break
20:00-21:30 scenes: band (only Jue on set is okay)
22:00 end of day

Fri 10/12

Due to miscommunication, no interviews were conducted on 10/6. Got some usable footage for concert prep and concert.

Rescheduled interview for 11am on Friday, 10/12. Mia will help again with sound.


Planning notes 10/12

- Use Autofocus first

- Bring 50mm and 85mm lenses

- Redo scenes (see below)

- Look up Johnny Johnny Hello music

Interview questions

Gilbert

Testing out audio/video

  • Can you tell me about your day so far?

You:

  • When did you move here... from where? Why?
  • The first time I came here, you mentioned that you need anger to do this. Why is anger important?
  • Do you think other people are angry?

Lies

  • What is your ambacht? Why did you choose it?
  • What is more important? Your workshop or your kitchen?
  • How do you divide or unite the different spaces - cafe, workshop, family? What's the relationship between these spaces?

both

  • When did you open this place?
  • How did you decide on the name of this place?
  • How did you envision this space? Have you realized your vision(s)?
  • How do you sustain it?
  • How has it changed?
  • What are some of your favorite performances that you hosted

Redo

10/12

tour of studio

wine rack

apple trees and Lies standing

pictures in the back

daughter

mirror frame of bar

Recap 10/12

9:00 pick up equipments at rental + test equipments + print out questions
10:30 meet Mia at Maastunnel
10:50 arrival
11:00 set up shoot
11:20 interview in cafe
12:15 interview in studio
13:30 lunch (spontaneous :)
13:50 more footage (action + outside)
14:30 end of shoot

On site, I interviewed the two sitting side by side, rather than separately as was in the script. I also didn't ask the questions in order. A lot of it is about weighing the situations as they happen, which is a nice challenge. The canon 5D battery lasted for about 3 hours of shooting. We didn't use a clip-on mic and opted for the zoom XY. No extra batteries was used for the mic.

For a small scale project like this, ideally I would work with at least two other people: one for cinematography and one for audio.