Technical rider: Difference between revisions

From XPUB & Lens-Based wiki
Line 34: Line 34:
=== organisational requirements ===
=== organisational requirements ===
* the assembly takes two days (2 x 8 h)
* the assembly takes two days (2 x 8 h)
* technician: during installation/build up a technician who knows the venue is required (construction, mounting and help).  
* technician: during installation/build up a technician who knows the venue is required (construction, mounting and help). (when specifically? rigging first thing, before load in. lighting adjustment and sound check before opening?)


=== required items that the exhibtion gallery/institution/space/... has to provide ===
=== required items that the exhibtion gallery/institution/space/... has to provide ===

Revision as of 13:41, 2 June 2024

Title of work

Short description of the work

  • Is it a performance, installation, workshop,...?
  • What is it made of?
  • What does it do?

space requirements

  • ~36m2 space ( Length x Width x Height: 6m x 6m x 3m)
  • the installation requires the possibility to mount a beamer on the ceiling
  • the installation requires the possibility to mount light spots on the wall
  • wall color

if performance: Seating / placement

  • should the audience sit? on what? chairs, floor, ...

light requirements

  • dark room
  • 4 x Theatre spots or similar (dimmable)
    • Warm light 3000-2000K
    • Lights must be placed on the floor (shadows on background) or ceiling

sound requirements

  • 1 x vocal microphone + stand
  • 2.1 Stereo Channel PA L+R:
    • Mackie, db technologies or similar
    • 1 × subwoofers
  • stage monitors:
  • 2 × stage monitors on stand (approx. height 1.50m)

power requirements

  • how many power plugs? cable length?

organisational requirements

  • the assembly takes two days (2 x 8 h)
  • technician: during installation/build up a technician who knows the venue is required (construction, mounting and help). (when specifically? rigging first thing, before load in. lighting adjustment and sound check before opening?)

required items that the exhibtion gallery/institution/space/... has to provide

  • extra lighting trusses
  • exhibition lighting
  • additional RGB par cans

I think all the below were just placeholders pls move them above this line if needed

  • socket 1 (Color: white, length x width x height: 1m x 1m x 1m)
  • socket 2 (color: green, length x width x height: 1m x 1m x 1m)
  • table (length x width x height: 1m x 1m x 1m)
  • projector (pixel size, ratio, type, projection, size)
  • monitor screen
  • active monitor speaker

required services the exhibtion gallery/institution/space/... has to provide

  • wifi internet
  • refrigerator space (approx 1 m2)
  • water

I think all the below were just placeholders pls move them above this line if needed

  • cable internet
  • ...

equipment/tools you need to build-up the installation/...

  • drill
  • ledder
  • ...

required items that the artists/collective will provide

  • computer

required services that the artists/collective will provide

  • ...

if installation/exhibition: switch on - switch off requirements

  • what must be taken into account when switching on and off?
  • remote control ??

trouble shooting contact

provide contact information in the case the installation doesnt work

content notes / exhibition notes

  • indicate if the work of art contains light flickering, high audio tones, ...
  • sensitive topics

! important the audience needs to know what to expect. For more information have a look here

exhibition plan

  • provide a plan of the installation / work of art / ...
  • add all parts/equipments to the plan
  • if light spots, indicate where they are positioned/mounted
  • indicate where the electricity plugs should be
  • ...