Technical rider: Difference between revisions

From XPUB & Lens-Based wiki
Line 37: Line 37:


=== required items that the exhibtion gallery/institution/space/... has to provide ===
=== required items that the exhibtion gallery/institution/space/... has to provide ===
* extra lighting trusses
* exhibition lighting
* additional RGB par cans
I think all the below were just placeholders pls move them above this line if needed
* socket 1 (Color: white, length x width x height: 1m x 1m x 1m)
* socket 1 (Color: white, length x width x height: 1m x 1m x 1m)
* socket 2 (color: green, length x width x height: 1m x 1m x 1m)
* socket 2 (color: green, length x width x height: 1m x 1m x 1m)
Line 42: Line 48:
* projector (pixel size, ratio, type, projection, size)
* projector (pixel size, ratio, type, projection, size)
* monitor screen
* monitor screen
* active monitor speaker  
* active monitor speaker


=== required services the exhibtion gallery/institution/space/... has to provide ===
=== required services the exhibtion gallery/institution/space/... has to provide ===

Revision as of 13:35, 2 June 2024

Title of work

Short description of the work

  • Is it a performance, installation, workshop,...?
  • What is it made of?
  • What does it do?

space requirements

  • ~36m2 space ( Length x Width x Height: 6m x 6m x 3m)
  • the installation requires the possibility to mount a beamer on the ceiling
  • the installation requires the possibility to mount light spots on the wall
  • wall color

if performance: Seating / placement

  • should the audience sit? on what? chairs, floor, ...

light requirements

  • dark room
  • 4 x Theatre spots or similar (dimmable)
    • Warm light 3000-2000K
    • Lights must be placed on the floor (shadows on background) or ceiling

sound requirements

  • 1 x vocal microphone + stand
  • 2.1 Stereo Channel PA L+R:
    • Mackie, db technologies or similar
    • 1 × subwoofers
  • stage monitors:
  • 2 × stage monitors on stand (approx. height 1.50m)

power requirements

  • how many power plugs? cable length?

organisational requirements

  • the assembly takes two days (2 x 8 h)
  • technician: during installation/build up a technician who knows the venue is required (construction, mounting and help).

required items that the exhibtion gallery/institution/space/... has to provide

  • extra lighting trusses
  • exhibition lighting
  • additional RGB par cans

I think all the below were just placeholders pls move them above this line if needed

  • socket 1 (Color: white, length x width x height: 1m x 1m x 1m)
  • socket 2 (color: green, length x width x height: 1m x 1m x 1m)
  • table (length x width x height: 1m x 1m x 1m)
  • projector (pixel size, ratio, type, projection, size)
  • monitor screen
  • active monitor speaker

required services the exhibtion gallery/institution/space/... has to provide

  • wifi internet
  • cable internet
  • water
  • ...

equipment/tools you need to build-up the installation/...

  • drill
  • ledder
  • ...

required items that the artists/collective will provide

  • computer

required services that the artists/collective will provide

  • ...

if installation/exhibition: switch on - switch off requirements

  • what must be taken into account when switching on and off?
  • remote control ??

trouble shooting contact

provide contact information in the case the installation doesnt work

content notes / exhibition notes

  • indicate if the work of art contains light flickering, high audio tones, ...
  • sensitive topics

! important the audience needs to know what to expect. For more information have a look here

exhibition plan

  • provide a plan of the installation / work of art / ...
  • add all parts/equipments to the plan
  • if light spots, indicate where they are positioned/mounted
  • indicate where the electricity plugs should be
  • ...